Services

HVAC audit and diagnostics

Independent HVAC expert review of design, installation, controls and energy — risk register, punch list and remediation plan. Civil, industrial, O&G, hotels and power plants across Uzbekistan.

Documentation
A–F risk rating
PDF photo report
5 day express
UZ nationwide

Systems and plant

Typical equipment and modes we commission — from central plants to BMS integration.

01

Design vs built

Drawings, specs, as-built gaps and non-conformities.

  • Drawings
  • Specs
  • As-built
  • Punch list
02

Ventilation

AHUs, balance, filters, heat recovery, smoke control.

  • Airflow
  • Pressure
  • HR
  • Fire modes
03

Air conditioning

VRF, chillers, fan coils, precision — install and controls.

  • Charge
  • Faults
  • Drain
  • BMS
04

Heating

Boilers, substations, hydronics, weather comp, DHW.

  • Hydronics
  • Cascades
  • Safety
  • Noise
05

Controls

Logic, priorities, interlocks, alarms, access rights.

  • Logic
  • Alarms
  • Trends
  • Access
06

Safety & energy

Fire modes, hazardous areas, benchmarks, redundancy.

  • Fire
  • Hazard
  • kWh/m²
  • Backup

Support stages

A clear path from document review to O&M handover with protocols.

01

Brief & data

Scope, drawings, manuals, BMS history, site contacts.

02

Survey

Site or remote walk-through with photo checklist.

03

Tests

Spot measurements, logic scenarios, design cross-check.

04

Risk scoring

Criticality matrix, timelines, handover impact.

05

Report

PDF with photos, corrective plan, budget ranges, presentation.

Typical tasks

Situations we see on civil, industrial and power facilities.

Before handover

Catch blockers before supervision and investor sign-off.

Repeat failures

Root cause instead of repeated call-outs.

High energy use

Wrong setpoints and 24/7 maximum modes.

Third-party install

Independent view before commissioning.

Due diligence

For lender, tenant or new owner.

Deliverables

What we record in logs and protocols for the client and operations.

Executive summary

1–2 pages for management.

Issue register

Photos, location, severity, action.

Remediation plan

Urgent / pre-start-up / in operation.

Budget ranges

Indicative costs without forced contracting.

Industry experience

Sites across Uzbekistan — on site, remote or mixed.

Civil

Offices, malls, residential, healthcare.

Industry

Plants, warehouses, clean areas.

O&G chemical

Process exhaust, hazardous areas.

Hotels

Corridors, kitchens, pools, conference.

TPP

Machine halls, auxiliary systems.

We audit design compliance, equipment, hydronics, air systems, controls, safety, energy and readiness for commissioning.

Deliverable: risk report, priorities and corrective plan.

Experience: typical faults in each sector — from offices to refineries and power plants.